Building: ISU Extension Development
Location: Ames, IA
Time: 6:43pm
Composition: On axis with the gravel "path." From what I observed, the rocks are used to create a visible boundary on the exterior of the building separating the conference space from the main building.
Process: None
Meta Data: 12mm f/4 SS: 1/400s ISO: 100
No comments:
Post a Comment